Skip to content
TallgrassPlumbing

Recent jobs

What was actually wrong.

Finished-work photographs are easy. The useful part is what the camera found before we started.

New PEX water lines clipped neatly along basement floor joists.

Staged whole-house repipe

Independence

Galvanised throughout. Done over three visits so it could be budgeted.

A newly installed tank water heater with neat copper supply lines.

50-gallon replacement

Olathe

Failed at nine years. Hard water sediment, as expected out here.

A split copper pipe in a frosted crawl space.

January burst repair

Lee's Summit

Crawl space run against an exterior wall. Insulated after repair.

A drain camera reel and monitor beside an open floor cleanout.

Clear and camera survey

Brookside

Roots at the third clay joint. Owner got the footage same day.

An older basement utility corner with old and new pipework side by side.

Mid-repipe

Brookside

Old galvanised left in place until the new run was tested.

A workshop wall of pipe wrenches, brass fittings and coiled PEX.

The shop

Kansas City

Every van restocked from this wall before it leaves in the morning.

Stop mopping. Start calling.

Get help now(816) 555-0118